{"data":[{"dataset":"SYS_WARN","publishTime":"2026-11-26T17:33:00Z","warningType":"IT SYSTEMS OUTAGE","warningText":"NESO has requested a Transmission Owner discontinue an outage within relevant Emergency Return to Service time, under STC Section C Part 2 (7).\r\\n\r\\nIssued by Power System Manager at 17:20 on 26/11/2026\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-26T16:58:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nNOTIFICATION CANCELLATION of GB TRANSMISSION SYSTEM WARNING \r\\n\r\\nThe GB Transmission System Warning\r\\n\r\\nELECTRICITY MARGIN NOTICE\r\\n\r\\nissued for the period from  16:00 hrs to 20:00 hrs on\r\\nThursday   26/11/2026 has been cancelled \r\\n\r\\nThe following GB Transmission System Warnings remain in force\r\\nNone\r\\n-\r\\n-\r\\n\r\\n\r\\nNotification Issued at 17:00 hrs on 26/11/2026\r\\nIssued by Power System Manager NESO Electricity Control Centre\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-26T14:04:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nELECTRICITY MARGIN NOTICE \r\\n\r\\nAn ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.\r\\n \r\\nFor the period:\r\\nfrom 16:00 hrs to 20:00 hrs on Thursday   26/11/2026  \r\\n             \r\\nThere is a reduced system margin. System margin shortfall 900 MW\r\\n\r\\nThe current contingency requirement is 0 MW.\r\\n\r\\n5500 MW of generation is excluded from the available system margin due to system constraints.\r\\n\r\\nMaximum Generation Service may be instructed.\r\\n\r\\nTrading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.\r\\n\r\\nSuppliers please advise National Energy System Operator of any additional Demand Control available.\r\\n\r\\nThe situation will be reviewed again by National Energy System Operator at 20:00 hours and an update issued.\r\\n\r\\nThis Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 14:05 hrs on 26/11/2026\r\\n\r\\nIssued by PSM NESO Electricity Control Centre\r\\n\r\\n**************\r\\n\r\\nInformation Note:-\r\\nAs the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-26T13:12:00Z","warningType":"SO-SO TRADES","warningText":"NATIONAL ENERGY SYSTEM OPERATOR NOTIFICATION of excess energy prices used for settlement outside of BALIT for SO to SO Transactions\r\\nover the National Grid/RTE  Interconnector.\r\\n\r\\nPrices cover 23:00Hrs Today to 05:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer 369.79; Bid 0.00 From NESO: Offer 701.21; Bid -210.36\r\\n\r\\nPrices cover 05:00Hrs Tomorrow to 19:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer 476.34; Bid 0.00 From NESO: Offer 1168.68; Bid -210.36\r\\n\r\\nPrices cover 19:00Hrs Tomorrow to 23:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer 369.79; Bid 0.00 From NESO: Offer 1168.68; Bid -210.36\r\\n\r\\n\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-26T11:11:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nNOTIFICATION CANCELLATION of GB TRANSMISSION SYSTEM WARNING \r\\n\r\\nThe GB Transmission System Warning\r\\n\r\\nELECTRICITY MARGIN NOTICE\r\\n\r\\nissued for the period from  08:00 hrs to 12:00 hrs on\r\\nThursday   26/11/2026 has been cancelled \r\\n\r\\nThe following GB Transmission System Warnings remain in force\r\\nEMN for 26/11/2026 12:00 to 20:00\r\\n \r\\n \r\\n\r\\n\r\\nNotification Issued at 11:11 hrs on 26/11/2026\r\\nIssued by PSM NESO Electricity Control Centre\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-26T08:58:00Z","warningType":"IT SYSTEMS OUTAGE","warningText":"NESO has requested a Transmission Owner discontinue an outage within relevant Emergency Return to Service time, under STC Section C Part 2 (7).\r\\n\r\\nIssued by PSM at 08:39 on 26/11/2026\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-26T06:38:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nELECTRICITY MARGIN NOTICE \r\\n\r\\nAn ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.\r\\n \r\\nFor the period:\r\\nfrom 12:00 hrs to 20:00 hrs on Thursday   26/11/2026  \r\\n             \r\\nThere is a reduced system margin. System margin shortfall 2790 MW\r\\n\r\\nThe current contingency requirement is 835 MW.\r\\n\r\\n5970 MW of generation is excluded from the available system margin due to system constraints.\r\\n\r\\nMaximum Generation Service may be instructed.\r\\n\r\\nTrading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.\r\\n\r\\nSuppliers please advise National Energy System Operator of any additional Demand Control available.\r\\n\r\\nThe situation will be reviewed again by National Energy System Operator at 14:00 hours and an update issued.\r\\n\r\\nThis Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 06:30 hrs on 26/11/2026\r\\n\r\\nIssued by Power System Manager NESO Electricity Control Centre\r\\n\r\\n**************\r\\n\r\\nInformation Note:-\r\\nAs the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-26T06:34:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nELECTRICITY MARGIN NOTICE \r\\n\r\\nAn ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.\r\\n \r\\nFor the period:\r\\nfrom 08:00 hrs to 12:00 hrs on Thursday   26/11/2026  \r\\n             \r\\nThere is a reduced system margin. System margin shortfall 1300 MW\r\\n\r\\nThe current contingency requirement is 44 MW.\r\\n\r\\n4990 MW of generation is excluded from the available system margin due to system constraints.\r\\n\r\\nMaximum Generation Service may be instructed.\r\\n\r\\nTrading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.\r\\n\r\\nSuppliers please advise National Energy System Operator of any additional Demand Control available.\r\\n\r\\nThe situation will be reviewed again by National Energy System Operator at 12:00 hours and an update issued.\r\\n\r\\nThis Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 06:30 hrs on 26/11/2026\r\\n\r\\nIssued by Power System Manager NESO Electricity Control Centre\r\\n\r\\n**************\r\\n\r\\nInformation Note:-\r\\nAs the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-26T01:33:00Z","warningType":"IT SYSTEMS OUTAGE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nNATIONAL ENERGY SYSTEM OPERATOR NOTIFICATION \r\\n\r\\nNature of Notification\r\\n\r\\nCANCELLATION OF WA API OUTAGE\r\\n                         \r\\nPlease be advised that the planned WA API Outage for\r\\nThursday 26/11/2026 has been cancelled\r\\n  \r\\n \r\\n \r\\n \r\\n \r\\n \r\\n \r\\n \r\\n\r\\nNotification Issued at 01:35 hrs on 26/11/2026\r\\n\r\\nIssued by Power System Manager NESO Electricity Control Centre.\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-25T23:33:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nELECTRICITY MARGIN NOTICE \r\\n\r\\nAn ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.\r\\n \r\\nFor the period:\r\\nfrom 06:00 hrs to 20:00 hrs on Thursday   26/11/2026  \r\\n             \r\\nThere is a reduced system margin. System margin shortfall 3180 MW\r\\n\r\\nThe current contingency requirement is 550 MW.\r\\n\r\\n2680 MW of generation is excluded from the available system margin due to system constraints.\r\\n\r\\nMaximum Generation Service may be instructed.\r\\n\r\\nTrading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.\r\\n\r\\nSuppliers please advise National Energy System Operator of any additional Demand Control available.\r\\n\r\\nThe situation will be reviewed again by National Energy System Operator at 08:00 hours and an update issued.\r\\n\r\\nThis Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 23:30 hrs on 25/11/2026\r\\n\r\\nIssued by Power System Manager NESO Electricity Control Centre\r\\n\r\\n**************\r\\n\r\\nInformation Note:-\r\\nAs the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-25T14:39:00Z","warningType":"IT SYSTEMS OUTAGE","warningText":"To All Balancing Mechanism Wider Access API EDL and EDT Users\r\\n\r\\nPlease be advised that there will be a planned outage impacting all WA API connected BMUs to the Balancing Mechanism from 11:30 to 13:30 on 26/11/2026.\r\\n\r\\nPlease note: this change does not impact Market Participants that have dedicated communication lines into the Balancing Mechanism. The Balancing Mechanism will be available throughout this outage for those Control Room users.\r\\n\r\\nFor any technical issues or incidents, please phone 0800 917 7111 or 0800 085 4806. Overseas callers should use +44 870 521 6121 and quote WA-API.\r\\n\r\\nAll Trading Points should notify their Control Points of this WA API outage to ensure that they are prepared to take telephone instructions or submit dynamic data changes to the ENCC.\r\\n\r\\nWA API Services Impacted during the Outage:\r\\n\r\\no       NESO_Health\r\\n\r\\no       NESO_Normalization\r\\n\r\\no       NESO_Instruction\r\\n\r\\no       NESO_Redeclaration\r\\n\r\\no       NESO_Submission\r\\n\r\\n\r\\nIssued by Power System Manager at 14:40 on 25/11/2026\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-25T13:51:00Z","warningType":"SO-SO TRADES","warningText":"NATIONAL ENERGY SYSTEM OPERATOR NOTIFICATION of excess energy prices used for settlement outside of BALIT for SO to SO Transactions\r\\nover the National Grid/RTE  Interconnector.\r\\n\r\\nPrices cover 23:00Hrs Today to 05:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer null; Bid null From NESO: Offer 701.21; Bid -210.36\r\\n\r\\nPrices cover 05:00Hrs Tomorrow to 19:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer null; Bid null From NESO: Offer 1168.68; Bid -210.36\r\\n\r\\nPrices cover 19:00Hrs Tomorrow to 23:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer null; Bid null From NESO: Offer 1168.68; Bid -210.36\r\\n\r\\n\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-25T11:16:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nNOTIFICATION CANCELLATION of GB TRANSMISSION SYSTEM WARNING \r\\n\r\\nThe GB Transmission System Warning\r\\n\r\\nELECTRICITY MARGIN NOTICE\r\\n\r\\nissued for the period from  14:00 hrs to 20:00 hrs on\r\\nWednesday   25/11/2026 has been cancelled \r\\n\r\\nThe following GB Transmission System Warnings remain in force\r\\nNone\r\\n \r\\n \r\\n\r\\n\r\\nNotification Issued at 11:05 hrs on 25/11/2026\r\\nIssued by Power System Manager NESO Electricity Control Centre\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-25T01:44:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nELECTRICITY MARGIN NOTICE \r\\n\r\\nAn ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.\r\\n \r\\nFor the period:\r\\nfrom 14:00 hrs to 20:00 hrs on Wednesday   25/11/2026  \r\\n             \r\\nThere is a reduced system margin. System margin shortfall 885 MW\r\\n\r\\nThe current contingency requirement is 975 MW.\r\\n\r\\n3300 MW of generation is excluded from the available system margin due to system constraints.\r\\n\r\\nMaximum Generation Service may be instructed.\r\\n\r\\nTrading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.\r\\n\r\\nSuppliers please advise National Energy System Operator of any additional Demand Control available.\r\\n\r\\nThe situation will be reviewed again by National Energy System Operator at 10:30 hours and an update issued.\r\\n\r\\nThis Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 01:45 hrs on 25/11/2026\r\\n\r\\nIssued by Power System Manager NESO Electricity Control Centre\r\\n\r\\n**************\r\\n\r\\nInformation Note:-\r\\nAs the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-24T15:44:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nNOTIFICATION CANCELLATION of GB TRANSMISSION SYSTEM WARNING \r\\n\r\\nThe GB Transmission System Warning\r\\n\r\\nELECTRICITY MARGIN NOTICE\r\\n\r\\nissued for the period from  15:00 hrs to 20:00 hrs on\r\\nTuesday   24/11/2026 has been cancelled \r\\n\r\\nThe following GB Transmission System Warnings remain in force\r\\nNone\r\\n \r\\n \r\\n\r\\n\r\\nNotification Issued at 14:16 hrs on 24/11/2026\r\\nIssued by Power System Manager NESO Electricity Control Centre\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-24T13:32:00Z","warningType":"SO-SO TRADES","warningText":"NATIONAL ENERGY SYSTEM OPERATOR NOTIFICATION of excess energy prices used for settlement outside of BALIT for SO to SO Transactions\r\\nover the National Grid/RTE  Interconnector.\r\\n\r\\nPrices cover 23:00Hrs Today to 05:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer 350.00; Bid 0.00 From NESO: Offer 701.21; Bid -210.36\r\\n\r\\nPrices cover 05:00Hrs Tomorrow to 19:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer 362.59; Bid 0.00 From NESO: Offer 1168.68; Bid -210.36\r\\n\r\\nPrices cover 19:00Hrs Tomorrow to 23:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer 350.00; Bid 0.00 From NESO: Offer 1168.68; Bid -210.36\r\\n\r\\n\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-24T10:44:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nELECTRICITY MARGIN NOTICE \r\\n\r\\nAn ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.\r\\n \r\\nFor the period:\r\\nfrom 15:00 hrs to 20:00 hrs on Tuesday   24/11/2026  \r\\n             \r\\nThere is a reduced system margin. System margin shortfall 800 MW\r\\n\r\\nThe current contingency requirement is 480 MW.\r\\n\r\\n6900 MW of generation is excluded from the available system margin due to system constraints.\r\\n\r\\nMaximum Generation Service may be instructed.\r\\n\r\\nTrading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.\r\\n\r\\nSuppliers please advise National Energy System Operator of any additional Demand Control available.\r\\n\r\\nThe situation will be reviewed again by National Energy System Operator at 15:00 hours and an update issued.\r\\n\r\\nThis Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 10:45 hrs on 24/11/2026\r\\n\r\\nIssued by Power System Manager NESO Electricity Control Centre\r\\n\r\\n**************\r\\n\r\\nInformation Note:-\r\\nAs the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-23T21:49:00Z","warningType":"ELECTRICITY MARGIN NOTICE","warningText":"From : Power System Manager – NESO Electricity Control Centre\r\\n\r\\nELECTRICITY MARGIN NOTICE \r\\n\r\\nAn ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.\r\\n \r\\nFor the period:\r\\nfrom 13:00 hrs to 20:00 hrs on Tuesday   24/11/2026  \r\\n             \r\\nThere is a reduced system margin. System margin shortfall 1150 MW\r\\n\r\\nThe current contingency requirement is 1000 MW.\r\\n\r\\n5100 MW of generation is excluded from the available system margin due to system constraints.\r\\n\r\\nMaximum Generation Service may be instructed.\r\\n\r\\nTrading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.\r\\n\r\\nSuppliers please advise National Energy System Operator of any additional Demand Control available.\r\\n\r\\nThe situation will be reviewed again by National Energy System Operator at 10:00 hours and an update issued.\r\\n\r\\nThis Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 21:50 hrs on 23/11/2026\r\\n\r\\nIssued by Power System Manager NESO Electricity Control Centre\r\\n\r\\n**************\r\\n\r\\nInformation Note:-\r\\nAs the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.\r\\n"},{"dataset":"SYS_WARN","publishTime":"2026-11-23T13:44:00Z","warningType":"SO-SO TRADES","warningText":"NATIONAL ENERGY SYSTEM OPERATOR NOTIFICATION of excess energy prices used for settlement outside of BALIT for SO to SO Transactions\r\\nover the National Grid/RTE  Interconnector.\r\\n\r\\nPrices cover 23:00Hrs Today to 05:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer 350.00; Bid 0.00 From NESO: Offer 701.21; Bid -210.36\r\\n\r\\nPrices cover 05:00Hrs Tomorrow to 19:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer 371.51; Bid 0.00 From NESO: Offer 1168.68; Bid -210.36\r\\n\r\\nPrices cover 19:00Hrs Tomorrow to 23:00Hrs Tomorrow (UK local time) and are in Euro/MWh.\r\\nFrom RTE: Offer 350.00; Bid 0.00 From NESO: Offer 1168.68; Bid -210.36\r\\n\r\\n\r\\n"}]}